DPW - 17201 - Gym Floor Replacement - Student Recreation Center - BSU

Replacement of the entire Gym wood floor.

Status

Bidding Closed

Prebid Date2/7/19 10:00 am

Bid Date2/19/19 2:00 pm

Company & Contacts

Idaho Division of Public Works

Barry Miller   (208) 332-1900

Location

Boise, Idaho

A description of the work of this project can be summarized to include the replacement of the entire gymnasium wood floor system including 3 full size basketball courts. Installation of a loose laid, sheet water proofing applied over the concrete slab. Verifying that the existing slab meets 1/8” in 10’-0” for level and if required fill low areas or grinding high points, and installing a new wood basketball flooring system. The Recreation Center must remain open throughout the entire construction. The Contractor is required to provide dust protection separating the gym area only while not interrupting access to the remaining Recreation Center.

Estimated Cost: $575,419