SBT ECDC Gymnasium

The project consists of the construction of a detached 6,680 SF Gymnasium building. The building structure will be a pre-engineered metal building with 8’ exposed exterior concrete walls, pre-finished metal wall panels and seamed metal roofing. Interior walls and floor framing will consist of conventional wood frame construction. The building will include restrooms, storage, and storage mezzanine (approx. 1600 SF).

Status

Bidding Closed

Prebid Date9/3/20 10:00 am

Bid Date9/17/20 3:00 pm

Company & Contacts

JHS Architects

Scott Lloyd   208-232-1223

Location

Fort Hall, Idaho

This addendum forms a part of the contract documents and modifies the original bidding
documents as noted below. Except as affected by data included herein, all other parts of the
contract documents shall remain in full force and effect. It shall be the sole responsibility of
the bidder to appropriately disseminate this data to all concerned prior to the bid time and
date. Acknowledge receipt of this addendum in the space provided on the bid form. Failure
to do so may subject the bidder to disqualification.