DPW 19234 ISU Rendezvous Bldg Roof Replacement

Roof System Replacement

Status

Accepting Bids

Prebid Date2/18/21 2:00 pm

Bid Date3/4/21 2:00 pm

Company & Contacts

Idaho Division of Public Works

Barry Miller   208-332-1900

Location

Pocatello, Idaho

A description of the work of this project can be summarized to include removing existing single ply membrane
roof down to the existing insulation. The existing insulation is to remain in place. Wet or damaged insulation
to be removed and replaced. New 60 mil PVC membrane to be installed. All associated flashings to be
removed and reinstalled unless damaged during removal or otherwise noted. Add alternates include a 30-
year roofing membrane guarantee and additional 2 inches of rigid insulation.

Estimated Cost: $600,000