DPW 21353 - Replace Chiller, Data Rm, 8th Floor, PTC, Capitol Mall

Replace the existing 20-ton outdoor drycooler, dual pump system, and indoor CRAC unit.

Status

Accepting Bids

Prebid Date11/30/21 2:00pm

Bid Date12/9/21 2:00pm

Company & Contacts

Idaho Division of Public Works

Barry Miller   208-332-1900

Location

Boise, Idaho

A description of the work of this project can be summarized to include replacing the existing 20-ton outdoor drycooler, dual pump system, and indoor CRAC unit. The new 20-ton cooling system shall integrate into the existing Liebert control system. Work shall also include replacement of some perforated floor tiles to improve airflow and to update the control setpoints of the existing 30-ton cooling system to improve system performance.

Estimated Cost: $179,000