DPW-22331- MIL: Building 950/951 Exterior Repair
Exterior Repairs includes Replacing Gutters with new heat trace in gutters with new snow rail system on existing roof and Removing vegetation along the roof over hang.
Status
Bidding Closed
Prebid Date11/20/23 2:00pm
Bid Date11/30/23 2:00pm
Company & Contacts
Idaho Division of Public Works
Barry Miller
208-332-1900
Location
Gowen Field, Boise, ID
Remove vegetation along top of berm that is within the drip line of the building’s roof overhang and vegetation that inhibits positive drainage away from the building. Remove & stockpile rock ballast including weed barrier at berm as required to infill and re- slope berm for positive drainage away from building. Infill depressed areas with clean topsoil, new weed barrier, redistribute rock mulch and additional mulch as required. Remove existing gutters and downspouts, install new gutters & downspouts. Bid Alternate 1: Install new heat trace in gutters. Bid Alternate 2: Install new snow rail system on existing standing seam roof.
Estimated Cost: $255,000