DPW-21364-Rebid Southwest Idaho Treatment Center HVAC Upgrade White Hall

Refurbish existing handler with air handler and control dampers of the system and provide ventilation and heating interior spaces.

Status

Accepting Bids

Prebid Date3/7/24 2:30pm

Bid Date3/19/24 2:00pm

Company & Contacts

Idaho Division of Public Works
Barry Miller  
208-332-1900

Location

Nampa, ID

A description of the work of this project can be summarized to include …

Base Bid

Contractor shall refurbish the existing air handler located on the second floor. Work scope to

include all sections of the air handler and the control dampers of the system. This refurbished

system will provide ventilation and heating to the interior spaces.

Contractor shall install Four (4) new ductless split systems to cool/condition select rooms –

Rooms: 170, 179, and 189. The new heat pumps shall be located on the roof.

BID Alternate #1

Contractor shall install Two (2) new ductless split systems to cool/condition select rooms –

Rooms: 184 and Hall 198. The new heat pump shall be located on the roof.

Estimated Cost: $105,000