DPW-25094-CSI Canyon Building New ADA Elevator Install

New ADA Elevator in canyon Building & Work includes selective demolition existing stairway, Concrete footing, & Roof Structure.

Status

Accepting Bids

Prebid Date 10/30/25 2:00pm
Bid Date 11/13/25 2:00pm

Company & Contacts

Idaho Division of Public Works
Kelly Berard  
208-332-1900

Location

Twin Falls, ID

A description of the Work of this project can be summarized to include: A new ADA elevator to connect

the ground floor and second floor of the Canyon Building at the College of Southern Idaho. Work to include

the selective demolition of existing stairway, concrete footings, and roof structure (open web steel joists).

New elevator to be installed with its associated hoistway. New area of refuge is also to be constructed on

the second floor. Power for the elevator is to be connected to an automatic transfer switch for emergency

operation. Automatic transfer switch and generator installation are provided in a separate project scope

(DPW 24090 CSI Emergency Generator and Data Center Improvements).

Estimated Cost: $450,000.00

In order to get files Digitally you just need to register with Docuproject.