A description of the work of this project can be summarized to include the following: replacing an existing
computer room air conditioner (CRAC) that cools the college’s primary server room. In order to improve
the resiliency of the server room’s cooling system, two new CRACs will replace a single existing CRAC.
These two new CRACs will be complete with outdoor condensers sized for 120 deg F ambient conditions
and each will be sized to carry the full load of the server room. Modifications to the electrical system will
eliminate single points of failure by creating redundant electric supply (generator power and building
power) to both the CRACs and the individual servers equipped with dual power supplies.
Estimated Cost: $350,000