DPW-19193-BSU South Campus Pressurized Irrigation
Adding new Pumpstation with removing existing irrigation structures around BSU.
Status
Accepting Bids
Prebid Date4/18/24 1:00pm
Bid Date5/23/24 2:00pm
Company & Contacts
Idaho Division of Public Works
Barry Miller
208-332-1900
Location
Boise, Idaho
A description of the work of this project can be summarized to include removing Student Union Irrigation
Pump Station, installing new pumpstation at Rossi Mill cannel, correct gravity irrigation structures at
Student Union old pumpstation, reconstruct pressure mainline from Rossi Mill cannel to Student Union,
remove existing bubbler and correct gravity irrigation lines at BSU Children’s Center, modify wet well and
gravity irrigation structures at Lincoln volleyball courts and integrate existing design for irrigation lines to be
placed in Belmont Street.
Estimated Cost: $3,517,850.00