Bozeman Yellowstone International Airport East Terminal Expansion Project Schedule 3

East Terminal Project Schedule 3.

Status

Accepting Bids

Prebid Date 9/18/25 2:00pm
Bid Date 10/1/25 2:00pm

Company & Contacts

Martel Construction, Inc.
Travis Kabalin , Mike Wilkinson, Tyler Ragen  

Location

Gallatin Field Road, Belgrade, MT 59714

Project Description:

Schedule 3

 Concrete, Precast, Masonry, Stone Masonry Veneer, Structural, Miscellaneous and Decorative Steel, Railings, Carpentry, Glu Lam Construction, Finish Carpentry, Casework, Solid Surface Fabrications, Countertops, FRP, Insulation, Caulking, Flashing, Expansion Control, Doors and Hardware, Access Doors, Traffic Doors, Sliding Pass Windows, Glazing, Mirrors, Storefront, Curtain Wall, OH Doors and Grilles, Glass Railing,

Metal Stud Framing, Drywall, Painting, Acoustic Ceilings, Drywall Suspension Assemblies, Wood Ceilings, Floor Coverings, Resinous Flooring, Floor and Wall Tile, Interior and Exterior Painting, Wall Covering, Signage, Toilet Compartments, Toilet and Bath Accessories, Folding Panel Partitions, Wall and Door Protection, Fire Place Specialties, Fire Extinguisher Cabinets, Lockers, Synthetic Grass, Grills and Screens, Trash Chutes, Fire Sprinkler, Plumbing, HVAC, Electrical, Communications, Access Control, Fire Alarm, Baggage Handling Systems, Cranes and Hoists

 This work is to include all tools, equipment, materials and labor to complete this project.

In Order to gain access to Digital Files you must be registered With Docuproject.