DPW-24030-AGRI Weights & Measures Lab HVAC System Replacement
Status
Accepting Bids
Prebid Date | 9/11/25 10:00am |
Bid Date | 9/25/25 2:00pm |
Company & Contacts
Location
Boise, Idaho
Phase 1: Weights and Measures - Full roof replacement, complete demolition of suspended ceiling system,
geothermal HVAC system, lighting, exterior overhead doors, interior doors and frames, and restrooms. Install a
new standalone HVAC system, suspended acoustical ceiling system, LED lighting, overhead exterior door,
interior doors, frame, hardware and new restrooms. The Necropsy will consist of new overhead door, exterior
main door, LED lighting work platform, miscellaneous plumbing and interior painting.
Phase 2: ISDA Administration Building – Will consist of the demolition of the main floor suspended ceiling system,
lighting, and insulation below the roof. Install new batt insulation below the roof, suspended ceiling system, and
LED lighting system. At the Basement level replace existing lighting fixtures with new LED lights.
Estimated Cost: $1,500,000.00
In order to get files Digitally you just need to register with Docuproject.