DPW-24227- Rebid: ISU: Meridian Install 2nd Cooling Tower Connection
Contractor is to install a 2nd fluid cooler on the heat pump loop new pipping & electrical power & Controls.
Plans
(click to expand/collapse)

Name | Size | ||
PDF_ 1 | 261.6 KB | ||
PDF_ 2 | 76.8 KB | ||
PDF_ 3 | 601.4 KB | ||
PDF_ 4 | 726.1 KB | ||
PDF_ 5 | 5.0 MB | ||
PDF_ 6 | 704.8 KB | ||
PDF_ 7 | 684.2 KB | ||
PDF_ 8 | 1.1 MB | ||
PDF_ 9 | 789.2 KB | ||
PDF_ 10 | 699.4 KB | ||
PDF_ 11 | 863.9 KB | ||
PDF_ 12 | 828.8 KB | ||
PDF_ 13 | 756.7 KB | ||
PDF_ 14 | 1.5 MB | ||
PDF_ 15 | 747.0 KB | ||
PDF_ 16 | 734.1 KB | ||
PDF_ 17 | 734.4 KB | ||
PDF_ 18 | 1.5 MB | ||
PDF_ 19 | 950.5 KB |